|
|
|
1-10 employees
View all
|
|
Construction
|
|
192 West 9th Street, St.Paul, Minnesota 55102, US
|
|
Eliminate pour strips with the PS=Ø® Mechanical Rebar Splice System. Pour strips are often specified to control shrinkage, creep and elastic shortening in post-tensioned and cast-in-place concrete. Without redesign, the PS=Ø® System eliminates pour strips, while allowing for volume change in the slab and providing structural continuity. PS=Ø® stands for pour strip zero. It utilizes proven coupler technologies that have been used worldwide for decades. With a tapered thread on one end and a grout-filled sleeve on the other, this patented system meets ACI Type 1 and Type 2 mechanical splice requirements, is ICC approved and made in the USA. Now you can eliminate pour strips, the construction delays, extra costs and safety issues they bring with the PS=Ø® Mechanical Rebar Splicing System.
|
PS=0 Email Formats | Example Email Formats | Percentage |
---|---|---|
{f}{last} | [email protected] |
75.00%
|
The widely used PS=0 email format is {f}{last} (e.g. [email protected]) with 75.00% adoption across the company.
To contact PS=0 customer service number in your country click here to find.
Find accurate personal emails, work emails and phone numbers for employees
Accelerate prospecting with instant access to 300M professionals from 30M companies with the right contact details.